Now Hiring – Start Your Career Here

Building Certifications

Navigating Florida’s building certification laws can be overwhelming. We help building owners understand the requirements and guide them through the applicable processes, connecting them to the right services at the right time.

16+ Years
Serving South Florida and Miami residents, HOAs and developers since 2010.
400+ Projects
Trusted across residential, commercial, and multi-family properties.
150+ Employees
Providing a safe work environment with growth opportunities.
Award-Winning Work
Recognized for quality craftsmanship and lasting results.

Our Work.
Across South Florida.

Siena
Coral Gables
Brickell Bay Club
Miami
Renaissance
Pompano Beach

What our clients say

[Approved client testimonial pending]
[Approved attribution pending]

What Does the Law Mean?

In May 2022, the Florida Legislature enacted Senate Bill 4-D, introducing new requirements for condominium and co-op buildings with three or more stories. This law establishes a statewide inspection program that mandates milestone structural inspections and structural integrity reserve studies to ensure the safety of these buildings.

Those who are subject to the law must complete a Phase One Milestone Inspection, potentially followed by a Phase Two Milestone Inspection should the results from the former justify it. Additionally, money must be set aside to cover needed repairs and improvements that are identified in those inspections, and board members who fail to comply can be held personally liable.

Phase-One Milestone Inspections must be led by a Florida-licensed architect or engineer and involve a professional team. These inspections require a visual assessment of primary structural elements to identify any significant damage that could affect the building’s integrity or occupant safety. Reports must be signed and sealed by team members, documenting any unsafe conditions and recommending further actions if needed. The associated costs are covered by the association as outlined in governing documents, though not all inspection expenses may be included.

Phase-Two Milestone Inspections may be required if Phase-One indicates a need. These inspections can include material testing, probing, or non-destructive methods like ground-penetrating radar. A detailed report must outline the inspection methods, any unsafe conditions, and the extent of structural deterioration, along with recommendations for maintenance or repairs. If necessary repairs are not made within a year, municipal authorities must assess the building’s safety for occupancy.

Effective December 31, 2024, unit-owner controlled associations must fully fund items identified in the structural integrity reserve study, with these funds restricted to the specified items. Failure to complete or properly fund the reserve study constitutes a breach of fiduciary duty for board members or officers. Non-compliance with SB-4D may result in personal liability for board members.

What Needs to be Inspected?

Law SB-4D is a new law and is still open to interpretation, with new information being issued by the Florida Legislature, Florida Building Commission, and Florida State Fire Marshal. However, the law appears to indicate that only elements related to building structure fall within the required scope of the studies, which at a minimum would include:

How we Can Help

We help define your project team and identify appropriate, cost-conscious resources for your building certification needs.

We help identify the inspection team, then review its milestone inspection findings with you to understand the improvements needed.

We help prioritize required repairs and plan a construction schedule around your budget.

Once we have our plan ready, we will identify all the necessary resources to implement it, and construction will begin.

Building Certifications FAQs

[Approved answer pending]

ICRI Supporting Member logo

Visit us at ICRI!

Bengoa will be at ICRI’s Spring Convention in Nashville March 15–18. Stop by and say hi.

ICRI Supporting Member logo